Kunming Luquan Beaut ifu l County Water Environment Comprehens ive Management Project (2126 sets of φ350 Disc Aerat ion Systems)

To ensure the proper installation, commissioning, and acceptance of the wastewater treatment project, and adhering to the guiding principle of "focusing on project quality and progress," ....

A Case Study of Non-Stop Retrofit of MBBR Process – A City Wastewater Treatment Plant

On September 25, 2019, a 200,000 m³/day wastewater treatment plant (WWTP) in a certain city successfully completed a standard-upgrading project while remaining operational...

Application of AAO-MBR Process in the Upgrading Project of a Wastewater Treatment Plant

A city wastewater treatment plant (WWTP) was initially designed for a flow rate of 140,000 m³/day, covering an area of 35,000 m². The plant's current design capacity is 140,000 m³/day...

Pilot Study on Upgrading a Chemical Group's Wastewater Treatment Plant Using MBBR Technology

A wastewater treatment plant owned by a chemical group in Zhejiang previously utilized the A2O process, primarily targeting the removal of high Kjeldahl nitrogen in the wastewate...

Upgrading and Operational Management of the MBR Membrane System in a Wastewater Treatment Plant

This wastewater treatment plant is designed to process 100,000 m³/day and utilizes an AAO+MBR process. The treated effluent meets the Class A standard of the "Pollutant Discharge Standards for Urban Wastewater Treatment...